Page 45 - ZEB AnnualReport 2015
P. 45

and doors. However, to fully evaluate the   building services, interactive user interfaces   building technologies, energy technologies,
          real performance of a building component,   and interplay with the energy system as a   and indoor climate jointly study the interaction
          exposure to real climatic conditions is   whole.                       between the physical environment and the
          necessary. This can be achieved in the ZEB                             users. The ZEB Living Laboratory is important
          Test Cell Laboratory.              The ZEB Living Laboratory is at the same time  in making sure that the solutions developed
                                             used to study various technologies and design  within ZEB Centre are tested and veriied
          The Test Cell Laboratory can be used for   strategies in a real world living environment:  at an early stage. The Living Laboratory
          research, development, and testing of low-                             strengthens collaboration between industry
          energy, integrated building systems under   • User centered development of new and   partners and researchers.
          realistic operational conditions. The laboratory  innovative solutions: the test facility is used   Contact: Thomas Berker, Ruth Woods and
          is made of two test rooms, each one   within a comprehensive design process   Hans Martin Mathisen.
          surrounded by a control volume. Each room   focusing on user needs and experiences.
          has one surface exposed to the outdoor, so                             The next step: ZEB Flexible Laboratory
          that different building envelope technologies   • Performance testing of new and existing
          can be tested in parallel, side by side. In   solutions: exploring building performance in a   ZEB Living Laboratory and ZEB Test Cells
          addition to comparative and calorimetric tests   context of realistic usage scenarios.  Laboratory allow development and research
          on building materials and building envelopes,                          on systems and technologies for smaller
          the Test Cell Laboratory is a technical   • Detailed monitoring of the physical behavior   buildings. A laboratory facility for testing of
          development facility where different building   of the building and its installations as well as   full-scale integrated systems for zero emission
          equipment and terminals can be tested and   the users’ inluence on them.  commercial and public buildings in a Nordic
          optimized, together with their control systems,                        climate is not yet available. The ZEB Flexible
          in combination with building envelope   ZEB researchers within the ields of   Laboratory will be such a facility.
          components.                        architecture, social science, materials science,
          Contact: Francesco Goia and Einar Bergheim.

          Facility for user-technology interaction
          studies “ZEB Living Laboratory”

          The “component” often having the most
          inluence on the energy use of a building is
          the user. A building laboratory is therefore not
          complete without facilities for evaluation of
          how different users interact with the buildings
          and its technologies and how this interaction
          inluences energy use.

          The ZEB Living Laboratory is a test facility that
          is occupied by real people, who are using the
          building as their home. The focus is on the   Figure 1. The igure shows a panorama view of building physics laboratory with rotatable hot box (grey
          occupants and their use of innovative building   box to the right), climate simulator (blue box in the middle), and RAWI box (rain and wind box, to the left).
          technologies, such as the intelligent control of   Photo: SINTEF Building and Infrastructure.




                                                                                               ZEB annual report 2015   45
   40   41   42   43   44   45   46   47   48   49   50